Once, at the connection decision
The flexibility envelope
- How much
- How fast
- How long
- How often
- What limits it
~73GW
of contracted data-centre demand in the connection queue by June 2025. Peak demand in 2025: 45 GW.2
9.2 →26.6GW
Installed data-centre capacity could reach 26.6 GW by 2035, up from around 9.2 GW in 2025.3
88 →340GW
Installed data-centre capacity could reach up to 340 GW by 2035, up from 88 GW in 2025.4
Earlier access, in exchange for flexibility.
FlexOptim is our optimisation engine. It models the whole data centre as one coupled system, within the site’s operating limits.
Once, at the connection decision
Every day, in operation
Same data centre, less power from the grid. The site’s own assets take up the gap.
A 100 MW site on a flexible connection: 60 MW firm, and grid import cut by up to 40 MW when the grid asks.
Start with a flexibility commitment your data centre can keep.
A daily operating plan that keeps the commitment.
Operator-approved automation, grid services and multi-site portfolios.
Who it is for
For developers and operators of large new-build and expansion data centres, where grid access decides the project timeline.
The strongest offer the site can take to the network operator.
An obligation the site can actually meet.
A connection decision made on evidence, not on nameplate ratings.
The network operator still decides what it offers. Fleximmer makes sure the site knows exactly what it can put on the table.
Customer SLAs, resilience, operating limits and recovery are hard limits in everything we model. Never trade-offs.
The operator stays in control.
Tell us about your site. We’d like to hear from data-centre developers and operators, engineering firms, investors and researchers.
Talk to us